![](https://www.surfacingsystems.co.uk/wp-content/uploads/2018/06/Wakefield-indoor-football-centre-4-800x500.jpg)
![](https://www.surfacingsystems.co.uk/wp-content/uploads/2016/05/Barnett-Wood-Infant-School.jpg)
![](https://www.surfacingsystems.co.uk/wp-content/uploads/2016/05/Barnett-Wood-Infants-2.jpg)
![](https://www.surfacingsystems.co.uk/wp-content/uploads/2016/05/Barnett-Wood-Infants-finished1.jpg)
Project Description
The team visited Barnett Wood Infant School in Ashtead, Surrey in early May to install a new rubber cycle track. The cycle track was laid with wet pour surfacing and the edging complete with 2,500 blocks & 11.5 cubic meters of concrete.
You can see the install process from start to end in the gallery above…